Sign In | Join Free | My adobecards.com
China JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD logo
JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD
JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD Agent Wanted around world!
Verified Supplier

9 Years

Home > Forged Steel Flanges >

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6

JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6

Brand Name : HUIXUAN

Model Number : flange

Certification : ISO9001:2008,BV,SGS,IST,UL.CTI

Place of Origin : China

MOQ : 1 piece

Price : Negotiable

Payment Terms : L/C, T/T

Supply Ability : 3000-5000Ton/month

Delivery Time : 30-50 days

Packaging Details : Poly wood case, wood pallet, steel frame support

Material : A105,16Mn

Ratio : 3:1

Melting process : LF+EF+VD

Max weight : 20T

UT : AS 1065 level 1

Grain : ASTM 6

Contact Now

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6

Reference

Material A105,16Mn
Equipment 3150T hydropress
Apply

Weld flange of petroleum pipe line

Melting process LF+EF+VD
Production process

Forging+heat treatment+rough machine+finish machine

Ratio ≥3
Applicable certificate ASTM,ASME,DIN,JIS,ISO,BS,API,EN
Executive standard JB/GB/EN/DIN/JIS/ASME/ASTM/ISO

Certificate authority

ISO,BV,SGS, IST, UL,CTI
Delivery term

Rough machine(N+T);finish machine(Q+T)

Test equipment

Spectrograph,UT device,tensile and impact test machine,metalloscope,hardness test machine

Service

Our service included the forging, process, heat treatment, finish machining, package, local logistics, customers clearance and maritime transport. We took the customer’s requirements as the principal thing, and pay attention on the products quality.

Custom property

Elements C Si Mn P S Cr Ni Mo
16MNn 0.13-0.20 0.17-0.37 1.20-1.60 ≤0.030 ≤0.030 ≤0.30 ≤0.30 --

Mechanical property

Dia.(mm)

TS/Rm(Mpa)

YS/Rp0.2(Mpa)

EL/A5(%)

RA/Z(%)

Type Of notch

Impact energy

HBW

16Mn Ø15 470-630 ≥345 ≥21 -- V -20℃≥34 ==

Max weight 20T
MOQ 1PC
Ex-works date 20-50 days
Package Wooden case,steel frame
Deliver terms FOB;CIF;CFR;DDU;
Payment T/T,LC
Transportation Air,ocean

Process procedure:

Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipment

  1. High-precision dimensional tolerance;
  2. Excellent mechanical properties;
  3. Produce different dimension based on customer’s requirements;
  4. Advanced manufacture equipments and inspection devices;
  5. Excellent technical personality;
  6. Control the production procedure strictly;
  7. Pay attention on the package protection;
  8. Quality full service.

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6


Product Tags:

stainless steel forged flanges

      

flange forging

      
 Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6 Manufactures

Connect Flange Forged Steel Flanges Petroleum Pipeline Flange ASTM 6 Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: JIANGSU HUI XUAN NEW ENERGY EQUIPMENT CO.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)